Maplytics empowering the Construction Industry

Build up a business on the pillar of Maplytics

Maplytics, the preferred 5-star rated app of AppSource is an interactive package that unleashes locational intelligence to ease and better the day-to-day operations of businesses within Dynamics 365 CRM. Being an all-inclusive app finely working with Dynamics 365 CRM, it is very popular for its unique functions such as automatically scheduling appointments, plotting optimized travel routes for the field reps, tracking their location in real-time, and much more.
The unique functions of Maplytics find their application across industries and the application in the field of construction is admirable. Let us have a look at some of the Construction based applications of Maplytics.

construction

Construction Industry

The construction industry is an umbrella of organizations directly in the business of constructing or repairing office spaces, residences, homes, etc., and the ones in the business of supplying raw materials to these building organizations. Let us have a look.

Challenges in Construction Industry

The popular challenges faced by the Construction Industry loiter in the category of supply chain management, resource optimization, market reach, etc.

Visits to Unknown Client Locations​

Organizations dealing in road construction must deploy resources to far places along with heavy equipment

Some office spaces and residential areas are in regions with no proper transport facilities or intense density of construction nearby

The supply teams often need to find raw material suppliers outside city limits or collect the same from sites such as forests, rivers, etc.

Often the clients or purchasers of raw materials are located in distant places

Finding help in preferred regions

Locating raw material suppliers nearby with the best rates

Searching markets nearby

Being in close proximity to equipment manufacturers, sellers, and repairers

Having offices near areas that have a lot of ongoing construction and development

Detecting means of Transport

Heavy construction material requires heavy transport and excellent road facilities

Quick transport is needed in the case of onsite accidents and other emergencies

Organized and planned schedules for work-life balance

The schedule boards for the construction resources need to be well-planned for weeks

Spare resources should be at hand for ad-hoc repairs, absentees, emergencies, time crunch

Deadlines are stringent and need planned addressing

Being emergency ready

A failure of bulky equipment, an unwarranted worker strike, or unavailability of raw material can happen without notice

Physical injuries and construction mishaps come on the go

Communicating effortlessly with the other stakeholders

Language often becomes a barrier between the managing staff and the frontline workers

Having the right mode of communication and documentation is a necessity

Solutions using Maplytics

Being technology-forward is one of the answers to being ready for any adverse situation in any industry. The Construction Field finds this application true to some extent. Here are possible answers to the common Construction challenges faced using Maplytics

Visualizing construction sites on a map, when often in a remote region becomes useful

The surrounding regions, their density, etc. could be gauged for the amount of noise generated or safety precautions to be intensified

The distance from the nearby construction site could be analyzed for monitoring purposes

The possible raw material suppliers around the sites can be viewed, added to the contact, and kept ready for services

The manufacturers of bulky equipment can be visualized and spoken to for deals

Renting places for additional equipment can also be considered within the vicinity of the construction site

Places required in case of emergencies and places providing food, water, and other basic necessities can also be plotted and finalized for daily use.

The construction projects often run on tight schedules with heavy financial investments so, holding a pre-approved schedule of resources is extremely essential

Replacement resources should be at hand to avoid overtime, overworking, strenuous work, etc.

The leased/ rented equipment needs to be used optimally and within time, thus, a schedule makes life easy

Frequent supervision and monitoring must be scheduled for quality work

Optimized, shortest, routes should be in place for daily commutes to the sites

Routes should be plotted and saved for medical emergencies

Pre-plotted routes provide ease of transportation for raw materials, heavy machinery, additional resources, etc.

Maplytics Success Stories

Contact Us

Download Maplytics Brochure